Projects  /  Case file 01

Three utility loops round a 45 m × 115 m press shop.

A press shop in Chakan asked us to lay out compressed air and cooling water for a new shed and its robot line. This is the drawing we made and what it adds up to.

Customer
Press shop, name withheld
Place
Chakan, Pune
Our scope
Layout drawing and bill of quantities
Shed
45 m × 115 m
Main pipe, all loops
1,087 m
01 The drawing
TAG site drawing · New shed · Water, air header and robot lineNot to scale
Designed byTAG Solutions India

What it shows

Three loops run round the walls of the shed, so every bay can be fed from two directions.

  • Blue is compressed air in PPCH 110 mm, pressure class PN10.
  • Red is cooling water going in, PPRCT 160 mm PN10.
  • Green is cooling water coming back, PPRCT 200 mm PN10.

The cooling tower and three pumps sit 15 m outside the left wall and feed the water loops.

The robot-line zone

On the right, a 15 m × 85 m zone gets its own 110 mm sub-headers for air, water in and water out. Thirteen branch lines leave them, each 15 m long with three or four outlets, and every outlet ends in a 1" valve.

What is left alone

The dashed lines are the existing press machines and their pipework. They are not in our scope; we only tie the new loops into the existing 3" and 4" headers and the new 300T press.

02 What it adds up to

Net lengths from the bill of quantities.

Lengths are read from the drawing and rounded to whole pipes. No wastage is added.

LinePipeNet length
Air main, loop and zone sub-headerPPCH 110 mm PN10421 m
Air branch lines, 5 × 15 mPPCH 63 mm PN1075 m
Water in, main loopPPRCT 160 mm PN10327 m
Water out, main loopPPRCT 200 mm PN10339 m
Zone water sub-headers, in and outPPRCT 110 mm PN10230 m
Water branch lines, 8 × 15 mPPRCT 63 mm and 75 mm PN10120 m
Outlets, 16 air and 24 water32 mm PN16 with 1" valve40 outlets

The full bill of quantities lists every pipe length, coupler, elbow, tee, branch adaptor, valve, flange and clamp with its part number. We prepare one like it for every job we design.

03 How to read a TAG drawing
Colour

Each service has one colour, on every sheet.

Supply and return never share a colour, so a fitter on a ladder can tell them apart at a glance.

Dashed lines

Dashed means existing.

Whatever is already in the plant is drawn dashed and stays out of the quantities.

Assumptions

Whatever we assumed is written down.

Layout drawings are not to scale. Every length or size we had to assume is listed with the bill of quantities, for you to confirm.

04 Built for the same customer

Their Unit 2,
installed by TAG.

A 500 m PPCH compressed-air line and a 1,000 m PPRCT cooling-tower water line at Nanekarwadi, Chakan.

Green and blue pipes on an overhead rack
Air and water on one rack
Pipe rack seen from below against the roof
Rack run under the roof
Pipe lines running the length of the press shop
Along the press shop
Technician at a machine beneath the pipe rack
At the machines
Have a shed, a line or a utility room to pipe? Send the layout and we will draw it.Send us your layout