TAG Solutions India. Trust, Articulate & Generate Talk to an engineer

Home  /  Installation

Built by our own fitters, tested before handover.

We do not hand your line to whoever is free. About 20 fitters and helpers work on our sites, with stores, purchase and project tracking behind them in Nighoje, Chakan.

Two TAG fitters fusing a blue PPCH compressed-air pipe on a shop floor
Fusion jointing on siteChakan
Green and blue pipe lines on an overhead rack inside a press shop
Air and cooling water on one rackPress shop · Chakan
Blue compressed-air pipe run along a crane bay
Air header along a crane bayChakan · about 600 m
Compressor, air receiver and dryer connected with blue PPCH pipe
Compressor, receiver and dryerNashik
01 How a job runs
  1. 01

    Site survey.

    We walk the route, measure it, and note the machines, the structure and the services already in place.

  2. 02

    Drawing and quantities.

    The layout drawing and the bill of quantities are agreed with you before material moves.

  3. 03

    Material to site.

    Pipe, fittings, valves, clamps and hardware are issued from our stores against the bill of quantities.

  4. 04

    Supports first.

    Supports go up at the spacing the pipe needs, so the line hangs straight and stays straight.

  5. 05

    Jointing.

    Fusion joints for polypropylene, clamp or push-fit joints for aluminium, welded or threaded joints for steel.

  6. 06

    Pressure test.

    The finished line is pressure-tested before it is handed over.

  7. 07

    Handover.

    You get the as-built layout and the test record, and we stay available for parts and changes.

02 What we install
Compressed air and gas

Ring mains, headers and drops.

In PPCH, Electra or EQOfluids aluminium, and steel or stainless steel for high pressure.

Water and liquids

Cooling, chilled and process loops.

In PPRCT, with CPVC or UPVC for general plant water and chemical lines once the fluid is checked.

Compressor rooms

Compressor, receiver, dryer and filters.

Interconnecting pipework in the utility room, with drains, bypasses and isolation where they are needed.

Want to know how many supports a run needs before we visit?Open the support spacing tool
Have a shed, a line or a utility room to pipe?Ask for a site visit